การทำรูเจาะ ( Hole ) ให้เป็นบ่อน้ำ ( Water Well ) พร้อมที่จะพัฒนาเอาน้ำขึ้นมาใช้ได้ เรียกว่าการทำบ่อ ( Well Completion ) ซึ่งประกอบด้วยการออกแบบบ่อ ( Well Design ) การใส่ท่อกรุท่อกรอง และการกรุกรวด ( Gravel Packing)
1.การออกแบบบ่อ
2. การใส่ท่อกรุท่อกรอง
3. การกรุกรวด(Gravel Packing)
4. การพัฒนาบ่อ
5. การทดสอบปริมาณน้ำ
รับเจาะบาดาล ติดต่อ คุณแอ็ด
What is groundwater drilling?
Well drilling is a technical matter for the driller in particular. But drilling will work. Must be at the person Others related with whether the owner of a drilling contractor or the drilling contractor or even a drill planner The first major issue involved including choosing the correct drilling machine Choosing this type of drilling machine It depends on several key elements, such as the purpose for which the water will be used. required amount of water depth of groundwater The hardness and orientation of the rock layers and cost budget The problem of incorrect selection of drilling rigs is common in Thailand. For example, one time a contractor drilled a well in a limestone deposit in Pak Chong District. Nakhon Ratchasima Province By using a reverse rotary drilling machine, this type of drilling machine is known to be impractical to drill in hard rocks such as limestone, where there are many hollows. Therefore, the problem that arises is not only, but not drilling down alone. There are still many problems with water that need to be used. but completely absorbed into the hollow When this problem was encountered, the contractor changed the machine to use a diamond drilling machine. Which can drill as deep as 400 feet as needed, but can drill a 2.5-inch hole. Because a diamond drilling machine is not a drill for groundwater. Including the time wasted because of the incorrect use of this drilling machine, about 6 months later, the Department of Mineral Resources received a request from the relevant government agencies to help fix it. The Department of Mineral Resources introduced a pneumatic drilling rig. To carry out and the piercing is done within 20 days 5 inches. You can't drill a bigger hole to insert the pipe. Because a diamond drilling machine is not a drill for groundwater. Including the time wasted because of the incorrect use of this drilling machine, about 6 months later, the Department of Mineral Resources received a request from the relevant government agencies to help fix it. The Department of Mineral Resources introduced a pneumatic drilling rig. To carry out and the piercing is done within 20 days 5 inches. You can't drill a bigger hole to insert the pipe. Because diamond drilling machines are not drilling machines for groundwater. Including the time wasted because of the incorrect use of this drilling machine, about 6 months later, the Department of Mineral Resources received a request from the relevant government agencies to help fix it. The Department of Mineral Resources introduced a pneumatic drilling rig. To carry out and the piercing is done within 20 days
Well Completion
Making a hole (Hole) into a well (Water Well) ready to develop water to use. Called to make a well (Well Completion), which consists of the design of the well (Well Design) to insert the filter pipe. And gravel (Gravel Packing)